Edmond Community

Welcome to Edmond, Oklahoma!

Located in the heart of Oklahoma, just north of Oklahoma City, Edmond is considered by many to be the “Crown Jewel” of Oklahoma. A stay in Edmond will place you minutes from international attractions such as the National Cowboy and Western Heritage Museum, Remington Park horse racing, and much more.

Edmond offers outstanding hotels, conveniently located attractions, championship golf, and wonderful shopping areas. Located on scenic Route 66, Edmond places you just minutes from international attractions such as the National Cowboy and Western Heritage Museum, Remington Park horse racing, the Lazy E Arena and picturesquely historic Guthrie, just to name a few!

View the Market Report for Edmond which includes average property values, inventory, market changes, and demographic data. 

Properties for sale in Edmond

NEVER LIVED IN, BEAUTIFULLY UPGRADED & PRICED BELOW APPRAISED VALUE! This exceptional 2026 home offers 2,713 square feet of thoughtfully designed living space with upscale finishes and custom features you don't always find in new construction. From the striking stone fireplace and soaring ceilings to the decorative wood beams, designer lighting, and gorgeous wood flooring, every detail makes an impression. The stunning kitchen features an oversized island, quartz countertops, beautiful cabinetry, Bosch appliances, and generous storage, opening to inviting living and dining spaces perfect for entertaining. The luxurious primary suite showcases a beautiful wood-accented ceiling, spa-inspired bath, and custom closet. With 3 bedrooms, 3 full baths, a half bath, dedicated office, and spacious upstairs bonus room with built-ins (opt. 4th bedroom), there's flexibility for guests, work, and relaxation. Outside, enjoy a covered patio with a built-in grill and outdoor entertaining space, without the upkeep of a large backyard. Conveniently located in East Edmond near I-35, shopping, and dining. Never occupied, extensively upgraded, at an exceptional pirce-an opportunity to enjoy luxury finishes and generous living space without the wait of building! $625,000 Active

4800 Indigo Lane Edmond, Oklahoma

4 Beds 4 Baths 2,713 SqFt 0.141 Acres

SELLER OFFERING 3-2-1 INTEREST RATE BUY DOWN WITH PEFERRED LENDER! Charming Craftsman style 3-bedroom home located in the quiet neighborhood of Knox Farm. The kitchen boasts beautiful quartz countertops, gas range, and large island/eating surface. The spaciousopen living/dining floorplan is great for entertaining! Large utility room with folding surface and ample storage. Convenient drop zone by the garage for coats, bags, and shoes for those on the go! The split plan provides distance between the primary suite and secondary beds and bath. Knox Farm amenities include a playground, splash pad, and welllit streets for safer evening strolls! Deer Creek schools. Owner Licensed. $294,900 Active

3901 NW 177th Street Edmond, Oklahoma

3 Beds 2 Baths 1,586 SqFt 0.132 Acres

Welcome home to this beautiful 4 bed 2bath home with a study. Large living with gas fireplace and tile flooring. Granite countertops in kitchen and walk in pantry. Main bedroom suite has tray ceiling, building ins, Separate jetted soaking tub and tile shower, dual sink vanity and walk in closet. Study is tucked away from bedrooms. Enjoy the covered patio, and open deck great for entertaining. Close to Shopping, Restaurants, and Hefner Parkway and Kilpatrick Turnpike. STORM SHELTER and NEW ROOF!!!!! $279,900 Active

16616 La Paloma Lane Edmond, Oklahoma

4 Beds 2 Baths 1,868 SqFt 0.164 Acres

Mediterranean beauty perched on a lovely .60 acre mol corner golf course lot in Oak Tree. The current owner has completed EXTENSIVE landscaping and hardscaping to create a resort-inspired setting. Step into an entertainer's dream with two spacious contiguous living areas, formal and casual dining spaces and a perfectly appointed kitchen that would make a pro-chef swoon! NEW Viking commerical grade range/oven, NEW Sub-Zero refrigerator, JennAir dishwasher, built-in microwave, wine frig, pantry and breakfast bar. A spacious office with NEW wood-look tile floors and French doors for privacy is tucked away at the front of the home for a nice private work space. High ceilings and a multitude of floor to ceiling windows usher in an abundance of natural light. Fabulous plantation shutters and handy builtins can be found thru out the home. All bedrooms have NEW carpet. The primary bedroom offers a spa-like ensuite bathroom w/double vanity, jetted tub, large walk-in shower & TWO walk-in closets. Three secondary bedrooms, all have walk-in closets; one has ensuite bath, the other two have a Jack & Jill bath with two sink vanity. The backyard is the crowning glory of this gem of a home offering a spectacular, unobstructed view of 11 E Fairway. Current owner replaced garage doors & openers, put in new gutters, installed an F-5 storm shelter, replaced both water heaters and painted entire interior and exterior. HVAC was taken up & over in 2013 w/floor vents filled in. See supplements for a list up updates and improvements. $880,000 Active

301 Carmel Valley Way Edmond, Oklahoma

4 Beds 4 Baths 3,793 SqFt 0.606 Acres

Spacious 4 bed / 4 full bath, 3,852 sq ft home on a 0.57-acre greenbelt lot in Hunters Creek Estates, Edmond schools. Oak hardwoods, beamed ceilings, two fireplaces, private office, upstairs game room with its own full bath, storm shelter, and 3-car garage. Unfurnished, available now. Pets considered. 12-24 month lease. $4,450 Active

3812 Creek Bank Drive Edmond, Oklahoma

4 Beds 4 Baths 3,852 SqFt 0.57 Acres

Set on just over three-quarters of an acre in Saratoga Farms, this 6,886 sq ft estate has the space, privacy, and finish you'd hope for at this level, and it's been meticulously cared for. The floor plan works just as well for a quiet weeknight as it does for a full house of guests. There are 4 generous bedrooms, 5 full baths, and 2 half baths, with several living and dining spaces that flow easily into one another. A private study makes working from home simple. The media room gives you a real theater feel for movie nights and game days. A butler's pantry sits between the kitchen and dining areas, so hosting a small dinner or a big celebration goes smoothly. Out back, there are no rear neighbors, just your own secluded retreat. The resort-style pool comes with a raised hot tub that spills over into it, so the yard feels like a getaway whether you're unwinding alone or entertaining a crowd. There's peace of mind built in too, with a whole-home generator and a Class 4 impact-resistant roof that's less than three years old. Homes in Saratoga Farms with this kind of care, privacy, and detail don't come up often. Schedule your private showing today. $1,385,000 Active

1645 Saratoga Way Edmond, Oklahoma

4 Beds 7 Baths 6,886 SqFt 0.821 Acres

Welcome home to this beautifully designed 4-bedroom, 2-bathroom single-story home in the sought-after Antler Creek community, zoned for the highly desirable Deer Creek school district! Built in 2026, this like-new Lennar home offers 1,460 square feet of thoughtfully designed living space with an open-concept layout connecting the kitchen, nook, and family room — perfect for entertaining or everyday living. The gourmet kitchen is a true showstopper, featuring a large center island, gas range, elegant quartz countertops, and an impressive walk-in pantry with plenty of storage for all your culinary needs. Durable hard surface flooring flows throughout the main living areas, while each bedroom is equipped with a ceiling fan for year-round comfort. Retreat to the private owner's suite, tucked away at the rear of the home for maximum privacy. This luxurious space includes an en-suite bathroom complete with a quartz vanity with dual sinks, a separate tiled shower, and a spacious walk-in closet. Two additional secondary bedrooms are located at the front of the home, ideal for family members, guests, or a home office setup. The home also includes a 2-car attached garage for convenient parking and extra storage. Ideally located just off May Avenue and NW 206th/Covell, this community provides easy access to shopping, dining, and everyday conveniences throughout the Edmond area. Don't miss the opportunity to lease this move-in-ready home in one of Edmond's most desirable new communities. Schedule your showing today! $1,725 Active

20425 Velvet Street Edmond, Oklahoma

4 Beds 2 Baths 1,460 SqFt 0.11 Acres

Welcome to this beautifully maintained, one-story home situated on a desirable corner lot in the Ironstone addition! Built in 2021, this 3-bedroom, 2-bathroom home offers 1,631 square feet of thoughtfully designed living space with stylish finishes and an inviting open-concept layout.The spacious living room features a beautiful fireplace with a stone surround, wood-look tile flooring, and plenty of room to relax or entertain. The kitchen is a standout with granite countertops, a large center island with breakfast bar seating, stainless steel appliances, gas range, decorative tile backsplash, and abundant cabinetry. The adjoining dining area creates an easy flow for everyday living and gatherings.The primary bedroom features a vaulted ceiling and generous natural light, while two additional bedrooms provide flexibility for guests, a home office, or additional living needs. Both bathrooms feature granite countertops and attractive finishes.Outside, the brick exterior, welcoming front entry, and corner lot add to the home's curb appeal. An attached two-car garage includes an in-ground storm shelter for added peace of mind during Oklahoma storm season.Located in the Ironstone community with convenient access to shopping, dining, and major thoroughfares, this home combines modern finishes, functional living spaces, and a fantastic Edmond location. Schedule your private showing today! $307,000 Active

3401 NW 159th Terrace Edmond, Oklahoma

3 Beds 2 Baths 1,631 SqFt 0.167 Acres

Don’t miss this spacious Edmond home in a popular community with a neighborhood pool. A grand staircase makes a memorable first impression, leading into an open, functional layout with generously sized rooms, ample closet space, and abundant storage. The primary suite offers two closets, with additional storage beneath the stairs. Enjoy the wooded lot and recent updates, including a new roof and fresh exterior paint. $415,000 Active

2824 N Ashecroft Drive Edmond, Oklahoma

4 Beds 4 Baths 2,799 SqFt 0.248 Acres

This Hummingbird floor plan features 2,025 Sqft of total living space, which includes 1,800 Sqft of indoor space and 225 Sqft of outdoor living. There is a 565 Sqft, three car garage with an in-ground storm shelter installed. This home offers 4 bedrooms, 2 bathrooms, 2 covered patios, and a large utility room. The great room welcomes a breathtaking cathedral ceiling with crows feet, a cathedral chandelier, a gas fireplace with our stacked stone surround detailing, large windows, rocker switches throughout, wood-look tile, and Cat6 wiring. The high-end kitchen has 3 CM countertops, custom-built cabinets to the ceiling with cabinet hardware installed throughout and under cabinet lighting, stainless steel appliances, a 5-burner cooktop, vogue tile backsplash, stellar pendant lighting, a corner walk-in pantry, and a large center island equipped with a trash can pullout, sink, and dishwasher. The elegant primary suite has a sloped ceiling detail with a ceiling fan, windows, Cat6 wiring, and our cozy carpet finish. The attached spa-like bath includes a dual sink vanity with framed mirrors, TWO spacious walk-in closets, a roomy European walk-in shower, and a free-standing tub. Secondary bedrooms feature high ceilings with ceiling fans, windows, spacious closets, and carpeted flooring. The covered back patio offers a wood burning fireplace, a TV hookup, and a gas line for your grill. Other amenities include Healthy Home Technology, a fresh air ventilation system, a tankless water heater, R-44 insulation, and more! $407,340 Active

2124 NW 171st Street Edmond, Oklahoma

4 Beds 2 Baths 1,800 SqFt 0.165 Acres

17625 Brass Drive in Edmond offers investors an opportunity to unlock value with multiple possible exit strategies. Featuring a backyard swimming pool, this property has the potential to become a standout resale or rental with the right improvements. Take on a full renovation to create a refreshed, market-ready home or explore a lighter update to position it for rental income. Whether you're looking to renovate and resell or add another property to your portfolio, this is an opportunity to put your strategy to work in Edmond.Broker has equitable interest in the property. $195,000 Active

17625 Brass Drive Edmond, Oklahoma

3 Beds 2 Baths 1,544 SqFt 0.16 Acres

The Holloway offers a spacious, open-concept layout with tall ceilings and abundant natural light streaming through large kitchen windows. Designed for effortless entertaining, the kitchen features quartz countertops, a gas range, and a generous peninsula that flows seamlessly into the dining area making it ideal for hosting dinner parties or gathering with family and friends.Durable hard-surface flooring extends throughout the main living area, where a striking fireplace creates a warm focal point. The private primary suite includes a spa-inspired bath with a quartz vanity, dual sinks, a soaking tub, and a tiled shower. Its large walk-in closet conveniently connects to the laundry room for added everyday functionality.Near the garage, a built-in mud bench and drop zone provide organized storage for shoes, jackets, backpacks, and daily essentials. An upgraded landscaping package completes the home’s inviting exterior.Included features:*Peace-of- mind warranties*10-year structural warranty*Guaranteed heating and cooling usage on most Ideal Homes*Fully landscaped front & backyard*Full Guttering*Fully fenced backyard.Floorplan may differ slightly from completed home.Discover Jackson Creek, an exciting new community now open in the heart of East Edmond at Douglas Blvd. and Coffee Creek Rd. Nestled in the highly-rated Edmond School District, this stunning neighborhood offers the perfect blend of convenience and natural beauty. Enjoy easy access to shopping, dining, and the scenic landscape of rolling hills that make Jackson Creek truly unique. Resort-style amenities await, including a luxurious clubhouse with a community pool, a fun-filled playground, fishing ponds, and peaceful walking trails. Whether you're looking to relax after a busy day or spend quality time outdoors, Jackson Creek has it all. $367,427 Active

8640 Spruce Street Edmond, Oklahoma

3 Beds 2 Baths 1,682 SqFt 0.138 Acres

Take advantage of this fall listing! Quality Deer Creek addition on a on a corner lot with an outstanding recreational backyard. Patio rec area is nearly as wide as the home.  A saltwater pool, cedar pergola,  wood burning fireplace, wide granite countertop to host cookouts, gas grill with extra burner, mini fridge and stainless sink. . Wrought wire fencing contains pool area with a cinder brick retaining wall. Landscaping galore with mature trees, underground wireless sprinkler, gutter guards.  The interior is highlighted with updated  lighting, wood-look ceramic tile flooring in living and formal dining area, double front doors with captain hatch windows. Primary BR with cathedral ceiling to 11' tall with laminate flooring and plantation shutters. Double master BR closet with built in chest and shelves, you won't believe the size! The primary bath has double vanity granite counters, corner medicine cabinets behind the mirrors, canned lighting over the sinks, Jetta tub and shower with dimensional tiles, linen cabinet.. Secondary BR's are opposite in this split floor plan and share a JJ bath. Both have step-in closets, plantation shutters and ceiling fans. Please view the pictures for additional information. $629,000 Active

18470 N Antler Way Edmond, Oklahoma

3 Beds 3 Baths 3,135 SqFt 0.668 Acres

Thoughtfully upgraded single-level home in gated Meritage Park, offering low-maintenance living on a greenbelt lot. The open living area is anchored by a gas-log fireplace and flows into a well-appointed kitchen featuring a built-in gas range, double ovens, a new beverage refrigerator, added cabinet and under-cabinet lighting, and convenient pantry outlets, ideal for the coffee pot or toaster to be out of sight. The office has a walk-in closet and can be used as the 4th bedroom.The covered patio and outdoor kitchen extend the living space into a private backyard retreat enhanced by a waterfall feature, new stained cedar fencing, updated landscaping, decorative rock, edging, rain-chain gutters and a newly added ceiling fan. The coordinating outbuilding has been painted to match the home and improved with heating, air conditioning, electrical service and lighting—creating a versatile space for a workshop, studio, hobbies or additional storage.Additional improvements include fresh interior paint throughout, spray-foam insulation in the attic, a water softener and filtration system, exterior security cameras, under-eave outlets for holiday lighting, new garage shop lights, expanded attic and garage electrical outlets, attic lighting, and a Rain Bird WiFi sprinkler controller.Meritage Park offers gated entry, a neighborhood pool, maintained common areas and lawn-maintenance benefits including fertilizer & weed treatment in a convenient Edmond location near Covell Road and Santa Fe Avenue. This move-in-ready property combines comfortable everyday living with meaningful upgrades inside and out. This is one of the best lots in the neighborhood with a large green belt area on the west side and there isn't a house behind, there are wooded trees, so it's like it's own little private oasis. $549,900 Active

2617 Semillon Way Edmond, Oklahoma

4 Beds 4 Baths 2,726 SqFt 0.2 Acres

Welcome to this charming home in the Copper Creek addition. This three bedroom, two bath home offers a desirable split bedroom floor plan designed for comfort and privacy. The spacious primary suite includes a shower tub combination and walk in closet, while the two additional bedrooms share a full bathroom. The large living room offers a cozy gas fireplace and wall of windows that fill the space with natural light. A separate office or study overlooks the front yard, ideal for working from home or a quiet retreat. The kitchen includes an electric cooktop and oven, dishwasher, microwave, small island, and convenient dining area, plus a walk-in pantry. A garden door opens to the side covered patio, creating an inviting outdoor space. This charming home offers a functional layout, comfortable living spaces, and desirable features for everyday living. $220,000 Active

2004 NW 172nd Street Edmond, Oklahoma

3 Beds 2 Baths 1,498 SqFt 0.155 Acres

Nantucket backs to a greenbelt in the Edmond School District & delivers outdoor living you have to see to believe. The backyard is a private retreat featuring a covered patio, a cabana w/ its own fireplace, waterfalls, a half court basketball court & a private gate opening right onto the greenbelt. Beautiful landscaping welcomes you at the front, and inside you’ll find a cozy gas fireplace, freshly painted cabinets & a dedicated home office. The primary suite is privately situated away from the secondary bedrooms & features a relaxing soaking tub plus double doors opening directly to the patio, so your morning coffee comes with a view. With resort style outdoor spaces, a smart split floor plan & a prime Edmond location, this home is ready to be enjoyed for years to come! $285,500 Active

2804 Nantucket Lane Edmond, Oklahoma

3 Beds 2 Baths 1,697 SqFt 0.29 Acres

Discover beautiful living in the highly sought-after Steeplechase community, located within the desirable Edmond School District! This stunning 4-bedroom, 3-bathroom home offers a thoughtfully designed open floor plan, soaring vaulted ceilings, oversized windows that fill the home with abundant natural light, beautiful flooring, and rich woodwork throughout. Step inside to a spacious living room featuring a cozy fireplace and custom built-in shelving, complemented by a versatile formal dining room that could easily serve as a home office. The living area flows seamlessly into the dining space and beautifully appointed kitchen, featuring quartz countertops, stainless steel appliances, a new dishwasher, built-in oven, gas cooktop, walk-in pantry, and a spacious center island with additional storage and electrical outlets. The thoughtfully designed split floor plan provides both comfort and privacy. Two secondary bedrooms share a convenient Jack-and-Jill bathroom, while the fourth bedroom is located near a full bathroom, ideal for guests. Tucked away in its own private wing, the spacious primary suite offers a relaxing retreat with a generous en-suite bathroom and walk-in closets. All bedrooms feature ceiling fans. Additional highlights include a dedicated laundry room with a utility sink, built-in shelving, mudroom area, and convenient exterior access. Step outside to enjoy the covered patio, perfect for relaxing or entertaining. A spacious three-car garage with an in-ground storm shelter adds convenience and peace of mind. Beyond the home, enjoy the wonderful amenities Steeplechase has to offer, including maintained greenbelts, a community swimming pool, park, and scenic walking trails. Beautiful craftsmanship, a functional layout, and an exceptional neighborhood setting make this home one you won't want to miss. Schedule your private showing today! $399,000 Active

3717 Derby Run Drive Edmond, Oklahoma

4 Beds 3 Baths 2,481 SqFt 0.336 Acres

Nestled in a beautiful gated community of Borgata, this exceptional home offers the perfect blend of elegance, comfort, and low-maintenance living. Rich architectural details, stunning woodwork, and impressive exposed beams create warmth and character throughout, showcasing craftsmanship that truly sets this home apart. Every detail adds to its distinctive charm, creating an inviting atmosphere that feels both timeless and refined.Enjoy the beauty of an established community and the ease of a lifestyle designed for less upkeep and more enjoyment. A truly special opportunity to experience quality, character, and effortless elegance in a desirable Edmond location. $420,000 Active

2511 Island Drive Edmond, Oklahoma

2 Beds 2 Baths 2,418 SqFt 0.171 Acres

This 3-bedroom, 2-bathroom traditional home is a hidden gem in Edmond!  Located in Kimberly Crossings gated community, it's tucked away on a quiet cul-de-sac and easy walking distance to the park.  Built in 2014 and well maintained, it offers 1,759 sq ft of bright, functional living space. The living room is centered around a cozy gas-log fireplace and has elegant flooring. The kitchen comes fully equipped with premium built-in appliances and ample storage.  When it's time to relax you can retreat to the primary suite or step outside to your private outdoor oasis, featuring a  large covered back patio. Perfect for morning coffee or entertaining friends.  HOA dues cover entry gate, greenbelt and park maintenance. Enjoy unbeatable privacy and peace of mind just minutes from top-tier Edmond shopping, dining, and highly rated schools. Schedule your private tour today! $295,000 Active

1825 Shady Lane Edmond, Oklahoma

3 Beds 2 Baths 1,759 SqFt 0.15 Acres

Best price point in Stonebriar! 3 BEDS/2.5 BATHS/DEDICATED OFFICE/3 CAR TANDEM GARAGE/2185 SQFT/EDMOND SCHOOLS! Amazing opportunity to get into this beautifully maintained 3-bed, 2.5-bath home that has it all: dedicated study, split floor plan, 3-car tandem garage, cohesive wood look tile throughout all living areas and hallways, new carpet(2024) in all bedrooms, outdoor living space with motorized sunscreens, neighborhood pool, and the best location close to Mitch Park, YMCA, schools, shopping, and everything Edmond has to offer. Large covered front porch welcomes you home, and step into the foyer area that opens to spacious living room featuring a cozy fireplace, perfect for relaxing or entertaining. The kitchen is a chef's delight with a center island featuring new quartzite countertops (2025) and bar seating, under-cabinet lighting, a pot filler, new sink and dishwasher (2025), and adjoining dining area which provides plenty of space for large family meals and entertaining many guests. Cute guest bath and a drop zone with hooks and a bench make living here so easy. Retreat to the primary suite featuring soothing colors and a spa-inspired bath with double sinks, a seated vanity area, Whirlpool tub, walk-in shower, plenty of storage, and an impressive walk-in closet with a built-in dresser, three levels of hanging space, and direct access to the laundry room. The laundry room offers generous storage, built in drying rack, and sink. Two spacious secondary bedrooms share a Jack-and-Jill bath, each with its own private vanity and sink. Outdoor living is easy with this large covered back patio featuring remote-controlled sun/privacy screens. Additional updates include a new water softener and water heater (2025). A sprinkler system keeps the lawn looking great. Stonebriar residents enjoy neighborhood pool, clubhouse, playground, fishing pond, greenspaces, and walking trails. $366,000 Active

505 NW 197th Street Edmond, Oklahoma

3 Beds 3 Baths 2,185 SqFt 0.179 Acres

Enjoy the feel of a nearly new home without the new construction price tag! Located in Edmond Schools, this beautifully maintained 4-bedroom, 2.5-bath home is packed with thoughtful upgrades and stylish finishes. The open living, kitchen, and dining areas feature gorgeous wood-look tile flooring, while the kitchen impresses with double ovens, cabinetry extending up to the ceiling, and a spacious walk-in pantry. CAT6 wiring throughout the home adds modern convenience. The primary suite is a true retreat, featuring a beautiful walk-in shower, soaking tub, and TWO walk-in closets! Outside, the covered patio and outdoor fireplace create the perfect setting for relaxing evenings or entertaining guests. A three-car garage with an oversized storm shelter adds even more functionality and peace of mind. With all the appeal of new construction and so many desirable features already in place, this home is one you won't want to miss! $344,000 Active

3209 Poppey Lane Edmond, Oklahoma

4 Beds 3 Baths 1,814 SqFt 0.165 Acres

Fantastic 3-bed, 2-bath home in Edmond's Northwood addition! This 1,600 SF home features a spacious living room with a classic brick fireplace, gas logs, and built-in shelving. The functional kitchen includes dark cabinetry, stainless steel appliances, and an adjacent dining area. Enjoy wood-look flooring throughout, a private owner's suite, and great outdoor space featuring both covered and open decks. Complete with a 2-car attached garage, OKC utilities, and top-tier Edmond schools (Orvis Risner, Cimarron, Memorial HS). Great location near Eastern and Memorial—schedule your tour today! $239,900 Active

2336 Appleway Street Edmond, Oklahoma

3 Beds 2 Baths 1,600 SqFt 0.177 Acres

*The Two Structures Incentive Program provides funds to lower closing costs or buy down rate.* Welcome to the Willow floor plan, a beautifully designed two-story home located in the sought-after Anthem community within the award-winning Deer Creek School District. This home offers 3 bedrooms and 2.5 bathrooms with a functional layout designed for modern living. The first floor features 9’ ceilings and an open-concept design that includes the primary bedroom, laundry room, powder bath, and spacious living, dining, and kitchen areas, perfect for everyday living and entertaining. A large under-stair storage closet adds valuable functionality. The kitchen is the heart of the home, featuring quartz countertops, custom cabinetry, Frigidaire appliances, a gas range, a walk-in pantry, and a center island ideal for gathering and meal prep. The main-level primary suite offers a private retreat with a single vanity featuring dual sinks, a walk-in shower tiled to the ceiling using the Schluter waterproofing system, and a spacious walk-in closet. Engineered hardwood flooring flows throughout the main living areas, adding warmth and durability, while elevated finishes and modern design details are found throughout. Built with durability and energy efficiency in mind, this home includes 2x6 exterior walls, a Post Tension foundation, James Hardie siding, Low-E Argon windows, Lennox high-efficiency HVAC, and a tankless hot water heater, all backed by a 2-10 Home Warranty. Enjoy outdoor living on the covered patio, perfect for relaxing or entertaining, along with a sprinkler system for easy lawn maintenance. Residents of Anthem will soon enjoy resort-style amenities including a pool, pickleball courts, playground, walking trails, and a scenic neighborhood pond, all conveniently located near shopping, dining, and major highways. $385,900 Active

4212 NW 180th Terrace Edmond, Oklahoma

3 Beds 3 Baths 1,857 SqFt 0.084 Acres

Timeless Charm, Spacious Living & Endless Possibilities in Gated Fenwick Gardens!Welcome home to this beautifully maintained, single-story gem offering the perfect blend of classic character, inviting spaces, and incredible potential! Nestled in the desirable gated community of Fenwick Gardens, this charming 3-bedroom, 2.5-bath home features a versatile floor plan designed for comfortable everyday living and effortless entertaining.A beautiful brick-and-stone exterior welcomes you inside, where original wood trim, warm architectural details, and generous living spaces create an inviting atmosphere. Enjoy a formal living area, an elegant dining room with a bay window and tray ceiling, and a spacious kitchen featuring a gas cooktop, built-in wall oven and microwave, abundant counter space, and a large center island accented by a charming brick feature wall.The light-filled den steals the show with its cozy fireplace and seamless access to an expansive, private covered patio, complete with a hot tub for your own backyard retreat! The oversized primary suite offers a relaxing escape with a soaking tub, separate shower, dual vanities, and a walk-in closet.Lovingly cared for by just two owners, this home offers a new roof installed in 2025 and a wonderful opportunity to add your personal style while preserving its timeless appeal.Enjoy the added lifestyle benefits of Fenwick Gardens, including a community pool, expansive greenbelts, and scenic walking and biking trails. Conveniently located in West Edmond near N. Penn and NW 164th, with easy access to shopping, dining, schools, and everyday essentials.Classic charm, an exceptional community, and room to make it your own, this is an opportunity you won't want to miss! Schedule your private showing today! $325,000 Active

16701 Covington Manor Edmond, Oklahoma

3 Beds 3 Baths 2,123 SqFt 0.143 Acres

15444 Bonita is a beautifully finished home with the upgrades already in place—truly better than new! The versatile layout features two bedrooms on the main level, with two additional bedrooms and a large bonus room upstairs, providing a separate and versatile living space. The striking kitchen is the centerpiece of the home, showcasing a spacious island, upgraded appliances, abundant soft-close cabinetry and a beautiful mix of rich black cabinetry and warm natural wood accents. A walk-in pantry with extensive built-in shelving, countertop space and a microwave oven provides exceptional storage and functionality. The living area is highlighted by a fireplace with custom wood detailing creating a warm architectural focal point. Custom window treatments and carefully selected finishes add to the home's polished, move-in-ready feel. The primary suite is complemented by a spa-inspired bath featuring dual vanities, a freestanding soaking tub, walk-in shower with floor-to-ceiling tile and sleek black fixtures. An impressive walk-in closet offers extensive custom built-ins, shelving, hanging space and drawer storage. Outdoor living continues on the covered patio with fireplace, perfect for relaxing or entertaining throughout the year. Additional upgrades include a home generator for added convenience and peace of mind. Located in desirable Deer Creek Village, residents enjoy outstanding neighborhood amenities including a clubhouse, swimming pool, basketball court, playground and walking trails. $675,000 Active

15444 Bonita Lane Edmond, Oklahoma

4 Beds 4 Baths 3,227 SqFt 0.241 Acres

Open House this Sunday, 10/25, 2:00-4:00. Welcome home to this nicely updated Edmond property offering 3 bedrooms, 2 baths, and an incredible backyard retreat! The spacious living room features soaring vaulted ceilings and a cozy fireplace, while a second living area provides wonderful flexibility for entertaining or relaxing. The floor plan is very versatile - could be 2 living and study or 2 dining and study or the study could be an additional living. The inviting kitchen offers granite countertops, stainless steel appliances, and a convenient breakfast bar. The primary suite features double vanities, whirlpool tub, shower and spacious walk-in closet. Recent improvements include luxury vinyl flooring in the living areas and study (2025), Lennox heat and air system (2025), hot water tank (2023), class 4 impact resistant roof (2024), Renewal by Anderson windows (2016). A storm shelter in the garage floor provides added peace of mind. Step outside and discover a truly exceptional backyard featuring expansive decking, beautiful hardscaping, lush flowerbeds, and a charming pergola. This peaceful outdoor oasis is perfect for morning coffee, evening gatherings, or simply unwinding at the end of the day. Conveniently located near the Kilpatrick Turnpike, medical facilities, shopping, dining, and the vibrant Chisholm Creek district. An incredible combination of comfort, updates, outdoor living, and location—all priced to sell! The HOA takes care of front-yard mowing, edging, and exterior trim painting, leaving you more time to enjoy everything this exceptional property has to offer. $299,900 Active

600 NW 143rd Street Edmond, Oklahoma

3 Beds 2 Baths 2,286 SqFt 0.251 Acres

Fresh finishes, a functional layout, and comfortable gathering spaces make this home ready for its next chapter.  New paint and flooring throughout.  The new front door opens to a well designed split floor plan, high ceilings and a fireplace creating an inviting gathering space in the living room.  The kitchen has everything you need plus overlooks the living area, keeping everyone connected while cooking, relaxing, or entertaining. Convenient access from the attached two-car garage through the laundry area makes unloading groceries a breeze. The split bedroom layout offers added privacy, including the primary bedroom with its own ensuite bath. Enjoy the garden tub, walk in shower and double vanity.  Bedrooms 2 and 3 plus full bath are great for kids, guests or office space. Step outside to enjoy the private yard and patio, with room to relax, hang out with pets, entertain, or make the outdoor space your own.  Agents, this is an estate.  Please see documents for important information.  Due to the nature of this transaction, please note title is open at Chicago Title. $229,900 Active

2409 NW 164th Terrace Edmond, Oklahoma

3 Beds 2 Baths 1,267 SqFt 0.141 Acres

Incredible red brick ranch with a beautiful yard for an incredible value and easy access to the neighborhood pool and rec area. New paint and carpet! Open and airy feel with large flowy rooms, a lot of natural light and fabulous windows, tall ceilings up to 12 feet and + 3 car garage! While there are 3 dedicated bedrooms, there is so much opportunity for modification for more bedrooms. ***This could work well as a multigenerational home.*** Oversized kitchen with a large island, breakfast bar, double ovens, large eating area open to an impressively spacious family room anchored by a beautiful brick fireplace with gas logs—the kind of room that makes you imagine curling up by the fire on a cold winter night. Beyond the family room is a game room - great for a pool table or a lot of space to turn it into a 4th bed...and there’s more! Large primary bedroom with adjacent living space perfect for study, sitting room or exercise. The home has been exceptionally well cared for and includes so many perks—a 2023 roof with full gutters, 2026 hot water tank, French Drains, sink in laundry, storm cellar, sprinkler system, detached backyard storage building, screened in porch with VIEWS, beautiful yard with approx 10' fence across the back in beautiful condition. Wonderful storage building in the back.  Split plan. Many private spaces. See floor plan in photos. $465,000 Active

19417 Yearling Way Edmond, Oklahoma

3 Beds 3 Baths 4,086 SqFt 0.374 Acres

Here is an incredible opportunity to own a lovely, updated home in the heart of Edmond on a spacious .20-acre lot in Thomas Trails, located in an area served by highly acclaimed Edmond schools! The big-ticket items have already been taken care of, including fresh interior paint, brand-new carpet, a roof that is only 5 years old with a recent roof clearance, professional cleaning, fresh landscaping, trimmed trees, and new window screens, making this home truly move-in ready. A clear termite inspection with certificate is also available for added peace of mind. Just inside the entry, you'll find a dedicated study with double doors, abundant natural light, and a closet, making it perfect for a home office or optional fourth bedroom. Continue into the inviting semi-open floor plan where soaring ceilings and large windows create a bright, airy feel. A gas fireplace with a beautifully painted mantel and updated tile surround serves as the focal point of the living room. The dining area flows seamlessly into the kitchen, making entertaining easy. The kitchen offers white painted cabinetry, granite countertops, a neutral tile backsplash, a spacious pantry, and a brand-new gas range. The refrigerator, dishwasher, microwave, and dryer are all included. The primary suite is generously sized and features an ensuite with dual vanities, a soaking tub, separate shower with a new glass door, and a large walk-in closet. Two secondary bedrooms are thoughtfully separated from the primary suite and share a well-appointed hall bath with updated fixtures. Additional improvements include updated hardware throughout, new front and patio door locks, sprinkler system, garage door opener, and abundant storage. Step outside to enjoy a fully fenced, east-facing backyard, perfect for relaxing or entertaining. With quality updates already completed and every detail thoughtfully refreshed, all that's left to do is move in and make it yours. Come see why this Thomas Trails home feels like home! $289,500 Active

2222 Appalachian Trail Edmond, Oklahoma

4 Beds 2 Baths 1,827 SqFt 0.201 Acres

Welcome to this One-of-a-kind Craftsman Beckett Plan in the historically inspired community of Town Square in East Edmond! This is the only Beckett that includes a study, increasing the square footage to 1737, and making it a 3 BED PLUS STUDY! The Curb appeal is the first thing you will notice as you drive up with Mature Landscaping, a large Covered Front Porch, and Fresh Exterior Paint! Upon entering there is White Oak Hardwood flooring that runs seamlessly throughout the main areas! The Living is quite the spectacle with its Wood Plank Trey Ceiling, Impressive Fireplace, and Built-in Media Cabinet with window bench! Not to mention the Wall of Windows with Custom Bali Roman Shades! The Kitchen was built to impress with floor-to-ceiling Custom Cabinetry…the uppers have glass fronts with cabinet lighting, and there is under cabinet lighting below! You will also find a Corner walk-in Pantry, Stainless appliances, Farmhouse Sink, & Gas Range! There is also a Custom Banquette in the dining with hidden storage and outlets! Out back is a large covered patio and wrought iron fencing! Additional Upgrades: * Extended 2 Car garage w/ insulated garage walls & insulated garage door *Surround sound in living *Bosch ultra-quiet dishwasher *STORM SHELTER * CAT5 data lines in primary, living and study *Outlet in living floor & top of mantle *Sherwin-Williams Rain Refresh Exterior paint (3/25) * Fresh stain on front door (3/25) * VersaLift electric attic lift in garage (3/26) * Elevated, heavy-duty garage storage rack. The Neighborhood Amenities include  a greenbelt, fishing pond w/ fountain & floating deck, community garden, playground, and wooded walking trails. The Plaza Section Annual Dues also include weekly lawn mowing and edging Spring to Fall, as well as, snow removal in Winter, Residents Clubhouse with Resort Style POOL, Fitness center, and the Teen Rec Center! Town Square also has year round holiday events, including pool parties, book clubs, game nights, and MORE! $435,000 Active

1824 Boathouse Road Edmond, Oklahoma

3 Beds 2 Baths 1,737 SqFt 0.149 Acres

The Dawson is a thoughtfully designed three-bedroom, two-bath home offering 1,295 square feet of comfortable, efficient living. Its open-concept layout creates a natural flow between the living area and kitchen, making it equally suited for relaxed evenings or effortless entertaining.The kitchen is both practical and refined, featuring a spacious island, quartz countertops, a gas range, and extra-tall upper cabinets that provide generous storage while maintaining a clean, tailored look. Just off the garage entry, a mud bench adds a layer of everyday organization.Durable hard surface flooring extends throughout the main living areas, combining style with ease of maintenance. In the primary suite, a dual quartz vanity, tiled shower, and walk-in closet offer a well-appointed retreat. Each bedroom is complete with a ceiling fan, and window blinds are included for a polished, move-in-ready finish.Discover Jackson Creek, an exciting new community now open in the heart of East Edmond at Douglas Blvd. and Coffee Creek Rd. Nestled in the highly-rated Edmond School District, this stunning neighborhood offers the perfect blend of convenience and natural beauty. Enjoy easy access to shopping, dining, and the scenic landscape of rolling hills that make Jackson Creek truly unique. Resort-style amenities await, including a luxurious clubhouse with a community pool, a fun-filled playground, fishing ponds, and peaceful walking trails. Whether you're looking to relax after a busy day or spend quality time outdoors, Jackson Creek has it all.Included features:*Peace-of- mind warranties*10-year structural warranty*Guaranteed heating and cooling usage on most Ideal Homes*Fully landscaped front & backyard*Full Guttering*Fully fenced backyard.Floorplan may differ slightly from completed home. $301,593 Active

8708 Spruce Street Edmond, Oklahoma

3 Beds 2 Baths 1,295 SqFt 0.138 Acres

You’ll love this beautiful 4 bed, 3.5 bath home located in the Lone Oak community! As you walk into this welcoming home, you'll be greeted with an open floor plan and plenty of natural light. The living room overlooks a beautifully landscaped backyard featuring a tranquil water feature and a spacious patio, perfect for entertaining or play. The open kitchen boasts stainless steel appliances, a gas range, granite counter tops, and a kitchen island for additional storage. The main bedroom features private patio access, a recently renovated en suite and large closet. Two of the three guest rooms are on the first floor, opposite the main bedroom, and share a full bathroom. The half bath and laundry room are conveniently located in the hallway off the kitchen which features a mudroom with plenty of built-in storage. The dedicated office is positioned at the front of the home and is perfect for working from home or for use as a flex room. Upstairs, you will find the third guest bedroom, featuring a full bathroom, large closet, and could easily be used as a bonus room. This home comes with custom plantation shutters, a water heater and dishwasher replaced in 2024, new HVAC in 2022, and a roof replaced with ArmorShield II Class 4 impact resistant shingles in October of 2019. This home is in an excellent location, near shopping, entertainment, and schools, with easy access to Hefner Pkwy and Kilpatrick Turnpike. HOA includes a gated entrance, playground, and maintenance of common areas. Don’t miss the opportunity to make this move-in ready home yours! $405,000 Active

16120 Promontory Road Edmond, Oklahoma

4 Beds 4 Baths 2,666 SqFt 0.179 Acres

Nestled in Tuscan Park, this exceptional 5-bedroom, 3.5-bath home of versatile living space. Highlights include two master suites (main-floor and upstairs), formal living and dining area, a study, media and bonus rooms also added on lounge. Designed for efficiency, it features spray foam insulation and separately zoned heat pump systems. Outside, enjoy a large lot with a wood privacy fence, two covered patios, and scenic pond views. Move in Ready, Schedule your showing for today. $615,000 Active

501 Mirano Lane Edmond, Oklahoma

5 Beds 5 Baths 3,998 SqFt 0.383 Acres

Charming Edmond home located in the highly desired Edmond School District offering the perfect blend of modern updates and classic comfort. Situated in a prime, central location, you will enjoy quick and easy access to a variety of local amenities, shopping centers, and dining hotspots. From the moment you arrive, the big, covered front porch welcomes you in, offering a picturesque space to relax and enjoy the neighborhood. Step inside to a beautifully and recently remodeled interior that shines with fresh paint, brand new doors, updated trim, and stylish new light fixtures throughout. The heart of the home features a massive living area with high ceilings centered around a cozy, two sided fireplace that seamlessly connects your living and entertaining spaces. An elegant, separate dining area sits nearby, making formal meals and holiday gatherings a breeze. Beautiful hardwood floors throughout, complemented by an abundance of dedicated storage spaces tucked away throughout the layout. The amazing kitchen is a chef's delight, boasting sleek granite countertops, a classic subway tiled backsplash, and premium stainless steel appliances. With tons of cabinet and counter space, meal prep and organization are completely effortless. Conveniently located just off the kitchen is a dedicated washroom, making household chores incredibly manageable. Expansive master suite, complete with an updated vanity, a large walk-in closet, and a beautifully finished walk-in shower. Updated main bath features a sleek granite countertop vanity and a versatile, shower/tub combo. Other two bedrooms are also generously sized, offering excellent closet space and plenty of room for family, guests, or a home office. Outside, the massive backyard provides endless possibilities for outdoor living, gardening, and play. The property also includes an outdoor storm shelter to keep you and your loved ones safe during Oklahoma's severe weather season. This turnkey Edmond gem truly has it all! $239,990 Active

1508 Magnolia Lane Edmond, Oklahoma

3 Beds 2 Baths 1,640 SqFt 0.206 Acres

Nestled in The Preserve at Oakdale Ridge—an intimate one-street community of just 30 homesites—this modern home in the Oakdale School District delivers a peaceful setting with no immediate neighbor behind it, as the homesite backs to a wooded green area. Enjoy convenient access to I-35, Broadway Extension, the Turnpike, Edmond, and downtown Oklahoma City in under 20 minutes. Intentionally designed for flexible living, the property lives larger than its footprint and adapts beautifully to changing needs. Outside, a welcoming front entrance foyer, extended back patio, pergola, and dedicated hot tub area create multiple inviting spaces to relax and entertain. The main residence is separated from a complementary casita, built to the same high standard of quality and style. The casita offers its own separate entrance, kitchenette, full bath, walk-in closet, and third bedroom—perfect as guest quarters, a fitness studio, home office, creative space, or an inviting retreat for multigenerational living. Inside the main home, a striking stone fireplace anchors the open living room, which flows effortlessly into the dining area and chef-inspired kitchen complete with a spacious island made for gathering and a walk-in pantry. Off the living area, a study with French doors opens to the foyer—an ideal spot for morning coffee or evening wine—and can easily serve as a playroom, movie room, or fourth bedroom. The main structure also includes a guest bedroom and full bath. The serene primary suite features separate vanities divided by a freestanding soaking tub, an oversized spa-style shower, and a generous closet with direct access to the laundry room. Every square foot has been carefully considered, offering an exceptional layout with a versatile casita that supports truly flexible living. Imagine stepping into a home that doesn’t just meet your needs—it elevates every moment of your life! $534,900 Active

4301 NE 125th Court Edmond, Oklahoma

3 Beds 3 Baths 2,256 SqFt 0.321 Acres

Built in 2022 and thoughtfully designed for everyday living, this 4-bedroom, 3.5-bath Craftsman in Edmond's Valencia neighborhood offers approx. 2,888 sq. ft. of light-filled space and smart, functional details.A bright, spacious entry opens to the main living area, anchored by a stacked stone fireplace and oversized windows. Tall ceilings throughout most of the home add to the open, airy feel.The kitchen is built for cooking and gathering, with quartz countertops, a tile backsplash, a gas cooktop, stainless steel appliances, and a walk-in pantry. Tucked off the pantry is a hidden "Harry Potter" room, a fun spot for playing or extra storage.The floor plan is designed around real life. From the garage, a mud bench drop zone leads straight into the primary closet, so you can change shoes or clothes as soon as you get home. The primary suite is a roomy retreat with a large soaking tub and dual sinks.Upstairs, a bonus living area with its own full bath and closet works well as a media room, play space, guest suite, or in-law setup.Additional highlights include an oversized garage and a tankless water heater.Modern finishes, a smart layout, and newer construction in Valencia. Schedule your showing today!Owner/Agents (159945,183874) $465,000 Active

18009 Marea Drive Edmond, Oklahoma

4 Beds 4 Baths 2,888 SqFt 0.176 Acres

$20,000 YOUR WAY- You could get a 5.99% Interest Rate! Seller is offering up to $20,000 toward a rate buy down, closing costs, or whatever works best for you. Buy down your rate and cut your monthly payment from day one. Step through the double front doors into soaring vaulted ceilings and an open floor plan made for entertaining. The kitchen has abundant cabinetry, stainless appliances, bar seating, and a big walk-in pantry. The primary suite is a true retreat, with dual vanities, a soaking tub, a walk-in closet, and direct access to the laundry room. Need room for toys, tools, or a workshop? The 3-car tandem garage delivers. Out back, you get a fully fenced yard, a covered patio for Oklahoma evenings, and full guttering. 3 bed, 2.5 bath, built in 2024. Book your showing today! (Interest rate pending buyers approval and current market conditions) $399,900 Active

149 Sage Brush Way Edmond, Oklahoma

3 Beds 3 Baths 2,140 SqFt 0.165 Acres

Super cute home made with quality materials and great workmanship! You will love the layout the moment you enter. Warm wood tile flows throughout the home connecting the main areas. The kitchen is loaded with custom cabinets, quartz tops, deep undercounter sink, a window over the sink, stainless steel Samsung appliances and more. The primary bedroom is very large as is the primary closet and primary bathroom. Fantastic floor to ceiling tiled showed in the primary bathroom. Both spare bedrooms are spacious and located near the guest bath. Handy outlet for electric vehicle charging in the garage. Beautiful neighborhood! $249,900 Active

2904 NW 196th Place Edmond, Oklahoma

3 Beds 2 Baths 1,249 SqFt 0.101 Acres

Special Promotion Available! For a limited time, enjoy $7,500 Your Way on select under construction or completed homes in Town Square or Bison Ridge communities. Use it towards a rate buydown, cash to close, design upgrades, appliance package, storm shelter options, or combine select incentives to fit your lifestyle best. Promotion available through October 31, 2026. This move-in ready, beautifully designed Modern Farmhouse in our Orwell plan offers the perfect blend of style, space, and function for modern family living. The open-concept layout is filled with natural light and features a stunning kitchen with quartz countertops and designer finishes. The primary suite is tucked away on the main floor and includes a spa-like bathroom and a spacious walk-in closet that connects directly to the utility room. A second bedroom and full bath downstairs add convenience for guests or family. Upstairs, you'll find the third and fourth bedrooms and another full bath for the kiddos! Located in The Plaza Phase 2—the final phase of Town Square—you’ll enjoy all the amazing community amenities such as a community fishing pond, greenbelt with walking trails, community garden, playground and access to the private Town Square Residents Club featuring a resort-style pool, fitness center, and more! Conveniently located near I-35, dining, and shopping in Edmond. $549,900 Active

1732 Paseo Place Edmond, Oklahoma

4 Beds 3 Baths 2,339 SqFt 0.171 Acres

Welcome to this new construction home in Castleberry, offering 1,701 square feet with four bedrooms, two baths, and a two car garage. Designed for everyday comfort and effortless entertaining, the open layout connects the living, dining, and kitchen areas while large windows bring natural light into the main living spaces. A striking fireplace creates a warm focal point for relaxing evenings, while wood look tile flows through the living room, dining area, kitchen, entry, and hall. The kitchen is designed to make daily cooking and gathering enjoyable, featuring custom wood cabinetry, quartz countertops, tiled backsplash, under cabinet lighting, a large island, decorative vent hood, and built in stainless steel Samsung appliances. The spacious primary bedroom offers a relaxing retreat, with a primary bath featuring a garden tub, floor to ceiling tiled shower, raised dual sink vanity, and a generously designed closet with additional seasonal storage. A covered front porch and covered patio extend the living space outdoors. Energy conscious features include a HERS Index rating of 46, 96 percent efficient tankless water heater, Low E windows, radiant barrier roof decking, LED lighting, high efficiency furnace, insulated air conditioning ducts, and attic insulation. Smart home features include an Ecobee programmable WiFi enabled thermostat and WiFi enabled garage door opener with battery backup. The finished two car garage also includes an electric vehicle charging outlet. Included warranties provide additional peace of mind. Castleberry offers a clubhouse with kitchen, dining space, fitness center, resort style pool, playground, sidewalks, and well maintained streets. Located just off 192nd Street between Penn and May in Edmond, this home combines thoughtful design, practical features, and community amenities. Schedule your private tour and experience the possibilities of this new home for yourself. $345,000 Active

2545 NW 196th Street Edmond, Oklahoma

4 Beds 2 Baths 1,701 SqFt 0.139 Acres

Gated community living meets everyday convenience in Princeton Parke! Located at 3900 NW 167th Terrace, this 4-bedroom, 3-bath home offers the space and versatility to accommodate a variety of lifestyles. With four bedrooms and three full bathrooms, the home provides flexibility for everyday living, guests, or additional workspace. Situated within the Deer Creek School District, this location offers easy access to Portland Avenue/Highway 74, connecting you to shopping, dining, entertainment, and destinations throughout the OKC metro. Enjoy the appeal of an established gated community without sacrificing proximity to the conveniences of city living! $349,900 Active

3900 NW 167th Terrace Edmond, Oklahoma

4 Beds 3 Baths 1,996 SqFt 0.272 Acres

At 3601 Winners Circle, this one has it all. Four bedrooms, three full baths, and a half bath, plus a three car garage, all on a large corner lot in Edmond's establishedSteeplechase addition. Beautiful wood stained trim runs throughout the home, and high ceilings with generous windows keep the main level bright. The floor planincludes a private study behind French doors, a formal living room off the entry, and a second family room in the back with an electric fireplace and an updated woodslat accent wall. The kitchen carries the same wood cabinetry with built-in stainless appliances. The primary suite sits on the first floor for privacy, with a soaking tub,separate shower, private toilet room, and walk-in closet. Upstairs are three more bedrooms and two full baths. Brand new carpet was installed 7/26 in the bedroomsand the upstairs hallway/staircase. The backyard is fully fenced and shaded by mature trees, with room for the patio, a pool, and yard to spare. It's one of the few flatlots in the neighborhood. HVAC was replaced in 2025. The location works from every angle: minutes from the interstate, close to Edmond's new east sidedevelopments, directly across from Edmond's golf club, and zoned for the Edmond school district, consistently rated among the best in the state. Steeplechase itself hasa pool, playground, greenbelt, and walking trails, with community events throughout the year, and the kind of settled-in, established feel that's hard to find in newerneighborhoods. Schedule a showing today! $424,900 Active

3601 Winners Circle Edmond, Oklahoma

4 Beds 4 Baths 2,627 SqFt 0.245 Acres

Your Vision, Crafted in Oak Tree Experience the pinnacle of luxury in this stately manor, currently under construction. This is a rare opportunity to secure a premier Oak Tree residence and personally select the finishing touches—from interior color palettes and custom cabinetry to designer lighting and high-end appliances. The home’s striking stucco and stone exterior with bold black accents sets a sophisticated, modern tone that continues throughout the spacious floor plan. The thoughtful layout offers a private sanctuary in the east wing, featuring the primary master suite and a quiet, dedicated home office. The west wing serves as an entertainer’s dream with a gourmet kitchen flowing seamlessly into a spacious family room anchored by an ornate gas fireplace. Sophisticated architectural details abound, including a sweeping staircase and dual fireplaces in the formal dining and living rooms. Upstairs, you will find two additional bedrooms, two baths, and a massive bonus room perfect for a home theater or play area. Situated on a prime lot, there is ample room to add a custom pool, pool house, or an additional garage at an additional cost. While the heavy lifting of the construction is complete, the final aesthetic is yours to define. Secure this masterpiece today and finish it your way. Living in this premier estate also grants you access to the world-class amenities of the Oak Tree community (membership required). Residents can join Oak Tree National or Oak Tree Country Club to enjoy championship golf on some of the finest courses in the region. Beyond golf, several social membership tiers are available at an additional cost, offering a vibrant lifestyle, including tennis and pickleball courts, and a resort-style swimming pool. Some photos area AI generated and are meant to show what it could be. The final product may differ based on your preferences if it is contracted before final decisions are made. $1,395,000 Active

533 Oak Summit Road Edmond, Oklahoma

4 Beds 6 Baths 4,544 SqFt 0.451 Acres

Welcome to 19601 Denison Avenue in Edmond, a move in ready new construction home offering 2,229 square feet of thoughtfully designed living space. From the moment you enter, warm wood look tile, a welcoming staircase and a spacious living room with fireplace create an inviting setting for everyday living and time with guests. The kitchen is designed to make both daily routines and entertaining easier, featuring custom cabinetry, under cabinet lighting, a large island, quartz countertops, a farm sink, stainless steel Samsung appliances and a decorative vented hood. A large tech area provides additional flexibility, while the spacious pantry and utility room add practical storage and convenience. Upstairs, the primary suite offers a generous retreat with abundant windows, a large soaking tub, tiled shower, two vanities and a roomy closet. Two additional spacious bedrooms provide comfortable living space, while the powder room adds convenience on the main level. The home also includes a three car garage and is located on a cul de sac street. Castleberry offers thoughtfully designed homes with open layouts, bright living spaces and features including large, roomy closets, quartz countertops and stainless steel appliances. Community amenities include a clubhouse with kitchen, dining space and fitness center, along with a resort style pool, playground and well maintained streets and sidewalks. Conveniently located just off 192nd Street between Penn and May in Edmond, this home combines comfortable living with access to community amenities and nearby conveniences. Schedule your private tour and experience 19601 Denison Avenue for yourself. $389,900 Active

19601 Denison Avenue Edmond, Oklahoma

3 Beds 3 Baths 2,221 SqFt 0.166 Acres

Beautifully designed with timeless finishes and a functional layout, this 2,845-square-foot home offers the perfect blend of style, comfort, and versatility. Soaring ceilings, warm wood-look tile flooring, and a striking fireplace create an inviting living space that flows seamlessly into the kitchen and dining areas. The kitchen features contrasting cabinetry, a spacious island with seating, and a convenient corner pantry, making it ideal for everyday living and entertaining. The thoughtfully designed floor plan includes 3 bedrooms, 2.5 bathrooms, a private home office, and a bonus/media room perfect for movie nights, game days, or additional flex space. A formal dining room and separate breakfast area provide options for both special occasions and casual meals. The private primary suite offers a relaxing retreat with an en-suite bathroom featuring dual vanities, a corner soaking tub, and a separate walk-in shower. Additional conveniences include a spacious closet and a laundry room with a built-in mud bench. A three-car garage and in-ground storm shelter add even more functionality. Located in The Reserve at Valencia within the Edmond School District, residents enjoy neighborhood amenities including parks, playgrounds, walking trails, ponds, and a community pool. Conveniently situated near shopping, restaurants, and everyday amenities, this home offers a wonderful combination of timeless style, flexible living spaces, and a desirable Edmond location. $530,000 Active

18604 Diego Place Edmond, Oklahoma

3 Beds 3 Baths 2,845 SqFt 0.211 Acres

WELCOME to this stunning home nestled in a sought-after Edmond School system in Asheforde Oaks! This beautiful spacious 4-bedroom, 3-bathroom, 2 living and a formal dining sits on a rare .574-acre lot, offering the perfect blend of city convenience and peaceful country living. Inside you will be greeted with warm and inviting atmosphere permeated throughout the entire house. Updates include fresh paint throughout the house, newer appliances in the kitchen, 7 Anderson windows and electrical blinds, engineer wood floor throughout the house. HVAC less than 4 years old and water heater 2025 complimented with garage elevator and huge outdoor storm shelter for your peace of mind. Step outside to an incredible backyard with fresh stained amphitheater surrounded by mature trees, creating a private retreat that's perfect for relaxing, entertaining, or letting the kids explore. The custom zipline adds a fun, one-of-a-kind feature. This is a rare opportunity to own a home that combines space, privacy and the best of both city and country living.  Easy access to surrounding areas including Turnpike, I-35, Restaurants and Shopping. Call today for your private showing. $421,000 Active

2617 Ashebriar Lane Edmond, Oklahoma

4 Beds 3 Baths 2,503 SqFt 0.574 Acres

Stunning—this beautiful home is conveniently located in the highly desirable, gated community of Lone Oak Park. Offering the perfect blend of modern luxury and functional design, this stunner is packed with premium upgrades and a unique floorplan you will love. Step inside and you are greeted by a large, bright flex-space perfectly suited for a formal dining room, second living area, or a home office. The expansive main living room features a majestic stone fireplace, beautiful wood floors, and spectacular custom woodwork that flows seamlessly into the gourmet kitchen. The bright kitchen offers an abundance of custom cabinetry, granite countertops, a gas stovetop, stainless steel appliances, walk in pantry, and large dining area.  The oversized master bedroom serves as a private retreat, featuring a unique secondary sitting area with endless possibilities (perfect for a nursery, office, reading nook, or exercise space) and a spa-like en-suite bath.  The east wing offers two more bedrooms and full bath with private vanities.  Upstairs offers a massive 4th bedroom or bonus room complete with its own full bathroom—perfect for a teen suite, guest quarters, or a media room.  Welcome home!!! $465,000 Active

4609 NW 162nd Street Edmond, Oklahoma

4 Beds 4 Baths 2,761 SqFt 0.196 Acres

Welcome to a cozy but open floor plan in Deer Creek Schools! Close to Turnpike and Hefner Parkway, its in the ideal location and great neighborhood!! Beautiful custom built home with 5 bedrooms, 4 bathrooms, 3 car garage. 2 car is extra deep for longer trucks/suburbans or flex area. Home features include wood beams, huge center island, study, vaulted master bedroom, 12 foot ceilings in living & kitchen. Bosch appliances with double ovens and 5 burner gas cook top. Large pantry. Upstairs is large bedroom or playroom with bathroom. All bedrooms have walk-in closets. Master has off-season pull-down clothes bars. Nice size laundry room with broom closet and shiplap/mudroom area. Luxury wood-look tile throughout living room and foyer! $585,000 Active

5300 NW 158th Street Edmond, Oklahoma

5 Beds 4 Baths 3,328 SqFt 0.257 Acres

Discover a fresh take on modern luxury at 2208 Old Creek, ideally situated in the prestigious Iron Horse Ranch community. At the heart of the home, the kitchen brings a modern design to life with open shelving, wood flooring, quartz surfaces, and a striking waterfall island offering generous space for gathering. The adjoining butler’s pantry elevates both entertaining & everyday living with double ovens, a walk in pantry, and second sink. The dining area provides plenty of room for memorable dinners & celebrations. A secondary bedroom with private ensuite & a convenient powder bath complete this area of the home. The luxorious primary suite is a private retreat, beautifully appointed with decorative wood ceiling beams that add warmth & architectural character. Double doors open to a spa inspired ensuite bath featuring two separate vanities, a dedicated dressing vanity, and an elegant freestanding soaking tub creating a serene, sophisticated space designed for both comfort & indulgence. The mudroom features mud bench & flows into an oversized laundry room with direct connection to the primary suite. Upstairs offers three additional bedrooms, one with a private ensuite & two sharing a true Jack & Jill bath. A bonus/game room & cozy reading nook create inviting spaces for movie nights, play, study, or relaxing. Recently refreshed throughout, the home features all new interior paint, carpet, toilets & plumbing fixtures, light fixtures, interior doors, door/cabinet hardware, along with select updated tile & wood flooring. Outdoor living is equally impressive with an expansive covered patio designed for year round enjoyment. A striking outdoor fireplace creates an inviting focal point, while the built in grill makes the space ideal for effortless entertaining, al fresco dining, and relaxed evenings at home.A rare combination of modern sophistication, generous living spaces, and extensive updates all within one of Edmond’s most sought after luxury communities.Welcome Home! $890,000 Active

2208 Old Creek Road Edmond, Oklahoma

5 Beds 5 Baths 4,333 SqFt 0.35 Acres

COMPLETELY RENOVATED 4-Bedroom Home with 3-Car Garage, Generator & Deer Creek Schools!!Welcome to this stunning 4-bedroom, 2.5-bath home that truly feels brand new! Completely renovated just one year ago, this home underwent a full transformation with no detail overlooked. The extensive renovation includes a new roof, flooring, HVAC system, hot water tank, and a beautifully redesigned kitchen featuring custom cabinetry, high-end finishes, a pot filler, and a double oven with built-in air fryer.The spacious layout offers plenty of room for everyday living and entertaining, with the fourth bedroom providing the perfect flexible space for a study or home office. The large pantry offers exceptional storage, while the oversized back patio is perfect for relaxing, grilling, or hosting friends and family.Additional highlights include a 3-car garage and a whole-home generator for added peace of mind. Located in the desirable Deer Creek school district with the benefit of Logan County taxes, this home offers an ideal combination of quality, convenience, and value.With a complete renovation from top to bottom, this is an incredible opportunity to enjoy the feel and finishes of a brand-new home without the wait. Great neighbors and a wonderful setting await you in this fantastic home! $499,000 Active

4805 Crestmere Lane Edmond, Oklahoma

4 Beds 3 Baths 2,620 SqFt 0.8 Acres

A true gem in the heart of east Edmond in the Fox Lake addition just moments from I-35! This stunning home offers the perfect blend of character, charm, and space to live beautifully. Nestled on a gorgeous lot with incredible trees, the home welcomes you with a light, bright atmosphere and timeless appeal and beautiful updates throughout. With 4 bedrooms, 2 living areas, a formal dining room, and an absolutely incredible office with all the Ralph Lauren-inspired vibes, there is room for every season of life. Whether you're hosting unforgettable gatherings, enjoying a quiet evening at home, working from your dream office, or simply spreading out and making the space your own, the possibilities are endless. The backyard feels like a private retreat, perfect for crisp fall evenings around the fire, time spent playing outdoors, or simply soaking in the beautiful trees and peaceful charm. Full of character, warmth, and tucked into an incredible Edmond location, this is the kind of home that makes you want to settle in and stay awhile. Don't miss the opportunity to make it yours! $595,000 Active

717 Fox Tail Drive Edmond, Oklahoma

4 Beds 4 Baths 3,822 SqFt 0.304 Acres

Charming, functional, and offering just the right amount of space, this 3-bedroom, 2-bath home is designed for comfortable living and easy entertaining! The private primary suite is thoughtfully separated from the secondary bedrooms, creating a desirable layout. The kitchen features a pantry and ample prep space, flowing seamlessly into the dining area and open living room—perfect for gathering with family and friends. Outside, enjoy the added appeal of a corner lot, guttering, and no home directly behind you for added privacy. A wonderful blend of comfort, functionality, and inviting charm! $235,000 Active

19601 Brookville Drive Edmond, Oklahoma

3 Beds 2 Baths 1,260 SqFt 0.119 Acres

Welcome to 545 E Oak Pl, tucked away behind a second set of gates within Edmond’s prestigious Oak Tree community. This beautifully updated 2-bedroom, 2-bathroom patio home with a dedicated study offers a unique combination of privacy, character, and spacious living. Step inside to discover refreshed interiors, beautiful wood flooring, and an abundance of natural light pouring through expansive windows. The home's distinctive U-shaped design creates a seamless connection between the indoor living spaces and multiple private outdoor patios. The expansive living room features a striking fireplace and flows effortlessly into the kitchen and dining areas, making it ideal for entertaining. The spacious kitchen offers abundant cabinetry, a large center island, generous counter space, and a breakfast area overlooking the outdoor living spaces. A separate formal dining room provides additional room for hosting family and friends. The private primary suite features a beautifully updated bathroom with a freestanding soaking tub, separate shower, dual vanities, and an impressive walk-in closet with custom built-in storage. The second bedroom offers its own private bathroom, while the dedicated study features rich wood paneling and built-in bookshelves, creating an inviting workspace or additional sitting area. A generously sized utility room provides extensive cabinetry and storage. Outside, enjoy multiple private patios surrounded by mature trees and established landscaping, offering peaceful spaces to relax or entertain. Experience the privacy, character, and convenience of patio home living in one of Edmond's most desirable gated communities, with Oak Tree Country Club amenities available through separate membership. $475,000 Active

545 E Oak Place Edmond, Oklahoma

3 Beds 3 Baths 2,925 SqFt 0.163 Acres

Welcome to this charming, updated three-bedroom, two-bath home on an interior corner lot in Edmond. The thoughtfully designed split floor plan offers comfort and privacy, while a brick fireplace creates an inviting focal point in the living space. Step outside to a spacious back patio, perfect for relaxing or entertaining, overlooking a fenced backyard and beautifully maintained yard. Located within the Edmond Schools district, this welcoming home blends everyday convenience with comfortable indoor and outdoor living. $229,000 Active

16229 Snake Drive Edmond, Oklahoma

3 Beds 2 Baths 1,267 SqFt 0.242 Acres

Beautifully maintained and ideally located, this stunning home combines timeless character, spacious living, and everyday convenience! Situated on a large lot, the sellers have gone above and beyond with extensive improvements, including fresh interior paint throughout, even the ceilings, and replacement of every window! Recent 2026 updates include new flooring in the kitchen, foyer, and laundry room, plus new wood flooring in the office. Additional 2025 improvements include new front and back doors, water heater, garbage disposal, garage door springs, added gutters, and a new front gate and front fencing. From the moment you enter, you’ll appreciate the soaring ceilings, beautiful architectural details, rich wood trim, and timeless wood flooring throughout several living areas. The inviting floor plan offers generous living and entertaining spaces, including a dining area and spacious living room flowing into the kitchen and adjoining living area. The kitchen features abundant cabinetry, granite countertops and breakfast bar seating, opening to a welcoming living space with a beautiful stone fireplace. The spacious primary suite offers a relaxing retreat with double vanities, a jetted soaking tub, separate shower, and generous walk-in closet. Additional bedrooms offer flexibility for guests, plus a  bedroom which could be used as a home office. The expansive backyard provides plenty of room for entertaining, gardening, or relaxing, while a garage storm shelter offers added peace of mind. Beyond the home itself, the location is exceptional! Enjoy rare walkability to Mitch Park, with its scenic trails and recreational amenities, along with nearby restaurants, grocery shopping, and the community pool. Located within Edmond Public Schools, this beautifully cared-for home offers substantial improvements, enduring architectural charm, an oversized lot, and a location that’s difficult to duplicate. An exceptional opportunity to enjoy the best of Edmond living! $374,900 Active

2433 Glenmere Drive Edmond, Oklahoma

4 Beds 3 Baths 2,234 SqFt 0.33 Acres

***New Roof Coming*** A storybook English cottage-inspired home smack dab in the middle of Edmond! Mortared stacked stone and red brick exterior (so cool!), soft sage green decorative shutters, gorgeous landscaping with curved brick-bordered flowerbeds, a winding walkway, sprawling shade trees-an amazing garden-like setting. The charming cottage-style front door has divided glass panes and a cafe curtain. Inside, beautiful wood floors and timeless traditional charm. The living room is big and has a breathtaking stone fireplace with gas logs, wood mantel and a hearth that sits flush with the floor. Wonderful windows and natural light throughout! The kitchen is large and loaded! Updated with white painted cabinets, white quartz countertops, tile backsplash, a spacious center island with granite countertop, breakfast bar, pantry, stainless steel appliances including a Jenn-Air gas stove, GE Profile built-in oven and microwave. Planning desk with great storage. Breakfast room open to the kitchen with wainscoting. The formal dining room has wood floors/would also make a fabulous additional living space. Divided-light French doors at the study with a pitched ceiling, built-in bookcase and storage. The lovely primary bedroom/bath has two separate vanities, a jetted tub, walk-in shower and a large walk-in closet. Upstairs has a living space at the landing. 3 bedrooms, 2 full baths. Outside, the charm continues with a spacious backyard, mature trees, established landscaping and a wonderful combination of covered and open patio space. Graceful curved brick wall and covered grilling station with red brick based prep space. There's also a delightful, cozy covered side porch! Additional off-street parking spot alongside the garage. Large above-ground walk-in storm shelter in the garage. Coffee Creek is an amazing community with walking trails, ponds, neighborhood clubhouse and pool. Walking trails connect to Mitch Park! See floor plan in photos (measurements to be verified). $499,000 Active

115 Lakeview Court Edmond, Oklahoma

4 Beds 4 Baths 2,857 SqFt 0.261 Acres

549 S Fretz Ave is a multi-level Edmond townhome built in 2014, with two bedrooms, two full bathrooms, one half bathroom and 2,098 square feet of living area per tax assessor. The kitchen includes an island and opens to the dining area. Both bedrooms and full bathrooms are on the second floor, with a half bathroom on the first floor. An attached two-car garage adds usable space beyond the interior. Included 100-Day Home Warranty with buyer activation. $297,000 Active

549 S Fretz Avenue Edmond, Oklahoma

2 Beds 3 Baths 2,098 SqFt 0.032 Acres

This show stopper in Kickingbird Estates just hit the market and has been meticulously taken care of, inside and out! As you pull up to the home, the first thing you will notice is the detailed curb appeal. Shade grass, gorgeous flowerbeds and magnificent stone make this one of a kind. Step inside the freshly updated home and you are greeted by the tall ceilings and tons of natural light. The living area is light and bright with gorgeous wood floors, plantation shutters and a fireplace to complete the vibe. Family gatherings are easy with the spacious room and bar area. There will be plenty of room for eating this holiday with the eat-in kitchen area plus the formal dining room. The bright kitchen features granite counters and barely used appliances with tons of storage space. The primary bedroom is freshly painted with hardwood floors and a private door to the back patio. An ensuite primary bathroom has an enormous soaking tub, separate shower and dual vanities. Head up the stairs to ALL NEW CARPET throughout. 3 spacious secondary bedrooms and a full bathroom make it the perfect layout for spreading out. A giant walk-in closet makes the storage perfect without having to get into the attic. Head back downstairs and step out onto the oasis of the backyard. The composite deck is perfect for enjoying the summer evenings overlooking the pool. The family can gather for pool parties, graduations or an evening jump off the diving board. As you further explore, you will find a luscious garden with a koi pond and fish with its own pump and environment. Over half an acre and every bit of it manicured with shade grass, cannas, begonias, banana plants and more! At the back of the property you will find a storage shed for all things yard and pool. With a roof that is just 2 years old, you can rest assured this home has been carefully maintained and is ready for its new owners. Don't miss out on a gem in this highly desired area of Edmond! $479,900 Active

1713 Eagle Drive Edmond, Oklahoma

4 Beds 3 Baths 2,688 SqFt 0.544 Acres

Corner lot modern farmhouse in Edmond with room for everyone. This 3 bed, 2.5 bath home pairs board and batten curb appeal with a standing seam metal porch accent, brick wainscot, and an oversized driveway. Step inside to wood look flooring throughout the main level, a bright entry with modern horizontal rail staircase, and an open concept layout made for gathering. The kitchen is the showpiece: deep charcoal shaker cabinetry, crisp white countertops, a large island with seating, gas range with stainless vent hood, stainless appliances, tile backsplash, and brass pendant lighting. The living room is anchored by a linear fireplace with wood mantel, flowing right into the dining area and back door to the covered patio. Upstairs, a huge second floor living space gives you a game room, media room, or home office without sacrificing a bedroom. The primary suite offers a spacious bedroom, private bath, and an oversized walk in closet with built in shelving. Secondary bedrooms include walk in closets too. Outside, the fully privacy fenced backyard is wide open with room to play, garden, or add a pool. Smart lock entry, downstairs half bath, and a well kept neighborhood complete the package. Schedule your showing today! $390,000 Active

505 NW 182nd Street Edmond, Oklahoma

3 Beds 3 Baths 2,211 SqFt 0.186 Acres

GREAT PRICE IMPROVEMENT FOR YOU! YOU WILL NOT WANT TO MISS THIS EXCEPTIONAL HOME IN THE EVER-POPULAR CLAYTON POND ADDITION. NOT TO MENTION IT IS THE LOWEST PRICED HOME IN THE ADDITION. THIS HOME FEATURES A LARGE LIVING AREA WITH CENTER FIREPLACE, A SEPARATE FORMAL DINING AREA AS WELL AS A BREAKFACT AREA OFF THE KITCHEN. BRIGHT AND AIRY WITH LOTS OF NATURAL LIGHT AND BEAUTIFUL WOOD FLOORING. THE KITCHEN FEATURES A GAS RANGE, MICROWAVE AND LOTS OF COUNTER AND CABINET SPACE. THE MASTER IS SPACIOUS AND THE CLOSET IS A WRAP AROUND SO MUCH BIGGER THAN YOU WOULD FIND IN A HOME OF THIS SIZE. THE SECONDARY BEDROOMS SHARE A BATH. OUTSIDE, THE BACK YARD FEATURES A VERY NICE COVERED PERGOLA AND ALSO A SMALL STORAGE SHED THAT REMAINS. THIS HOME IS ABOUT 1/2 BLOCK FROM THE COMMUNITY POOL AND THE NEIGHBORHOOD ALSO HAS A COUPLE OF SMALL LAKES IN THE COMMON AREA THAT IS MAINTAINED BY THE HOA. ADDITIONALLY, THIS HOME IS LESS THAN 1/4 MILE FROM I 35 SO EASY ACCESS WHEREEVER YOU WANT OR NEED TO GO, THE AREA HAS ABUNDANT DINING AND ENTERTAINMENT AREAS AS WELL AS EASY ACCESS TO HEALTHCARE. SCHEDULE YOUR APPOINTMENT TODAY, YOU WILL NOT BE DISAPPOINTED. $328,000 Active

4108 Eaton Place Edmond, Oklahoma

3 Beds 2 Baths 2,112 SqFt 0.298 Acres

Welcome to East Edmond’s highly sought-after Bella Terra neighborhood, where timeless elegance, thoughtful updates, and inviting outdoor living come together in this meticulously cared-for home. Situated on a 0.63-acre lot, this beautiful residence offers a welcoming blend of architectural character, comfortable living spaces, and modern conveniences. From the moment you enter, you’ll appreciate the grand entryway, soaring ceilings, and stunning staircase featuring wrought-iron railings that create an impressive first impression. Beautiful, large-body tile floors enhance the entryway and guide you to the kitchen and living room. The spacious living room is anchored by a beautiful stone fireplace, creating a warm and inviting gathering space for relaxing evenings or entertaining family and friends. The generously sized kitchen features custom cabinetry, new appliances, abundant workspace, and a convenient walk-in pantry, offering both style and functionality for everyday living and special occasions. A dedicated study provides the perfect setting for working from home, managing household responsibilities, or creating a quiet retreat with a beautiful cathedral ceiling with exposed beams and oversized windows. The downstairs half bath adds convenience for guests, while 3 well-appointed bedrooms are located upstairs along with 2 full bathrooms that provide flexibility and comfort for family and visitors alike. Recent improvements include fresh interior paint and new carpet, giving the home a refreshed feel and making it move-in ready. Step outside to enjoy the wooded backyard, where mature trees provide a beautiful natural backdrop and a sense of privacy. The large covered patio creates an ideal setting for outdoor dining, morning coffee, or relaxing evenings surrounded by nature. Bella Terra residents enjoy an exceptional collection of neighborhood amenities, including a community swimming pool, clubhouse, park, basketball court, and open grassy sports field. $619,900 Active

1956 Ella Court Edmond, Oklahoma

4 Beds 4 Baths 3,196 SqFt 0.63 Acres

OPEN HOUSE 10/11 THIS SUNDAY 2-4pm Located in a gated community within highly sought-after Edmond Schools, this move-in-ready home offers an exceptional neighborhood lifestyle with a community pool, walking trails, park and picturesque pond with fountain. Mature trees create a peaceful setting, while the tree-lined backyard and side deck just off the dining area provide an inviting outdoor space for relaxing or entertaining.Inside, a spacious and flexible floor plan features two large living areas, plantation shutters throughout and ceramic tile flooring through nearly the entire home. The front living area welcomes you upon entry and opens to a private office that can also serve as a fourth bedroom, offering flexibility for work, guests or additional living space.At the heart of the home, the large entertainer’s kitchen features updated granite countertops, stainless steel appliances, a gas range, abundant cabinetry and generous workspace. The kitchen flows into an oversized dining area and second living room, where a focal gas fireplace anchors the open gathering space. From the dining area, step directly onto the side deck overlooking the mature, tree-lined backyard.The spacious primary suite offers a comfortable retreat with an updated en suite bath featuring new countertops, a soaking tub and updated shower. With its desirable gated setting, neighborhood amenities, versatile floor plan and thoughtful updates throughout, this home is ready to enjoy from day one. $325,000 Active

2101 Del Simmons Drive Edmond, Oklahoma

4 Beds 2 Baths 2,161 SqFt 0.179 Acres

*Builder is offering $10,000 incentive money for you to use towards closing cost, upgrades, or to buy your rate down. Welcome to your dream home in one of Edmond’s newest premier additions! This stunning new construction offers 4 spacious bedrooms, 3 full bathrooms, and a versatile media/rec room — all within 2,547 square feet of thoughtfully designed living space. Situated on a generous 0.75 acre (MOL) lot, this home blends modern comfort with room to breathe. The oversized 4-car garage features two 16' x 7' overhead doors, ideal for vehicles, tools, or hobbies. Enjoy both a covered front porch and a covered back patio — perfect spots to unwind or entertain guests. Step inside to find a warm and inviting family room centered around a beautiful wood-burning fireplace, perfect for cozy evenings at home. The kitchen features custom cabinets, granite countertops, stainless steel appliances including a space-saver microwave, sound-insulated dishwasher, and disposal, plus plenty of workspace for everyday living or hosting. Additional perks include a private well and an aerobic septic system for added efficiency and peace of mind. This home has it all — space, style, and the serenity of country-style living just minutes from Edmond conveniences! Don’t miss your chance to own a brand-new home on a generous lot in one of Edmond’s most exciting new communities! Chickens are allowed. Home is complete and can close anytime! Schedule your private showing today! Home is complete! $540,000 Active

11737 Ward Road Edmond, Oklahoma

4 Beds 3 Baths 2,547 SqFt 0.75 Acres

ASK ABOUT SELLER PAID CONCESSIONS!!!Tucked away on a quiet cul de sac and backing to peaceful green space, this home offers the perfect mix of comfort, style, and community living. The brick and stucco exterior creates beautiful curb appeal and a welcoming first impression. Inside, the open layout is filled with natural light and features neutral finishes, wood look tile flooring, and a spacious living area with a gas log fireplace that flows easily into the dining space and kitchen.The kitchen is ready for everyday living and entertaining with quartz countertops, stainless steel appliances, and a 5 burner gas range. The primary suite offers a relaxing retreat with separate vanities, a soaking tub, separate shower, and large walk in closet. Upstairs, two oversized bedrooms share a Jack and Jill bath, giving everyone plenty of space.Out back, enjoy the large covered patio, added privacy, and greenbelt space with no immediate backyard neighbor. The Grove offers so much to enjoy with parks, playgrounds, a community pool, fitness center, lakes, greenbelts, walking areas, and neighborhood events throughout the year. Located in Deer Creek Schools with The Grove Elementary right inside the community, plus easy access to SH 74, the Kilpatrick Turnpike, shopping, dining, and entertainment. This is more than a great home. It is a place to settle in, enjoy the neighborhood, and love where you live. Owner/Broker $399,900 Active

3428 NW 186th Street Edmond, Oklahoma

3 Beds 3 Baths 2,198 SqFt 0.187 Acres

A rare find in the sought-after Main Street development by downtown Edmond: nearly a quarter of an acre with alley access from behind, offering multiple points of entry and flexibility for builders and investors alike. Just steps from the Edmond Raildyard, the splash pad and Chitwood Park, this location puts you at the heart of everything downtown Edmond has to offer. The existing 4-bedroom, 3-bath home has a converted garage and offers a solid opportunity to renovate or hold the land for future new construction. Whether you’re an investor, builder, or buyer looking to create something special, this is a rare chance to secure a sizable footprint in one of Edmond’s most walkable neighborhoods. $175,000 Active

408 W Main Street Edmond, Oklahoma

5 Beds 3 Baths 1,432 SqFt 0.241 Acres

The MAGNOLIA floor plan is a four-bedroom home that offers convenient single-story living. An open-concept layout combines the kitchen, living and dining areas, with a nearby covered patio providing simple indoor-outdoor living. All four bedrooms are tucked away to the side of the home for optimal privacy and comfort, including the lavish owner’s suite with a full bathroom and walk-in closet. Prices, dimensions and features may vary and are subject to change. Photos are for illustrative purposes only. Everything's Included: Washer/Dryer, Refrigerator, Garage Door Opener, Closing Cost assistance available. Home is currently under construction with anticipated completion in October. $276,000 Active

1725 Sugar Pine Way Edmond, Oklahoma

4 Beds 2 Baths 1,613 SqFt 0.138 Acres

Brand new carpet and fresh paint, basically looks like a brand new home! This perfectly maintained and stunning 4-bedroom, 3-bathroom brick home in The Grove offers 2,693 square feet and an oversized 3-car garage. A gabled entry and covered front porch lead inside to an open-concept layout with wood-look tile floors throughout the main living areas. The living room features a stacked-stone gas fireplace with built-in shelving. The kitchen has a high end custom look with quartz counters, a large island with plenty of seating, gas cooktop, and stainless appliances. A dedicated office provides space for remote work or study. The primary suite is spacious with plenty of natural light, with an ensuite bath offering a freestanding soaking tub, dual vanities, separate walk-in shower, and oversized walk-in closet. Three additional bedrooms offer space for family or guests. The backyard has a covered patio with a wood-burning fireplace and backs up to a greenbelt for added privacy and a more quiet feel. Located in The Grove, this beautiful home is located in Deer Creek schools and close to shopping, dining, and parks or wherever you need to be. $479,900 Active

3421 NW 188th Street Edmond, Oklahoma

4 Beds 3 Baths 2,693 SqFt 0.265 Acres

Welcome to this charming home where character, functionality & inviting living spaces come together in a wonderful setting just steps from the neighborhood park & pool! From the moment you enter, soaring ceilings & a wall of windows fill the home with natural light, while the distinctive dual-sided brick fireplace with a wraparound mantle creates a beautiful focal point w/ plenty of space for seasonal decor & treasured displays. The spacious entry features a convenient nook, perfect for a drop zone & flows seamlessly into the main living room w/ built-ins with views into the additional living space. Ideal as a playroom, game room, or secondary living, this flexible space offers endless possibilities & direct access to the back patio, extending your living & entertaining space outdoors. The adjacent dining room connects effortlessly to the kitchen, making everyday living & entertaining a breeze. The kitchen offers abundant cabinetry & storage, stainless steel appliances, brick accents surrounding the range & built-in microwave & a peninsula w/ additional seating, creating a warm & functional space for gathering. The spacious primary suite features soaring ceilings, abundant natural light & a beautifully appointed en-suite bathroom with dual vanities, a soaking tub, walk-in shower, private water closet & generous walk-in closet. Two spacious secondary bedrooms are thoughtfully positioned on the opposite side of the home, each with high ceilings, ample closet space & beautiful natural light. They share a conveniently located bathroom w/ ample storage & a classic tub/shower combination. A dedicated home office at the front of the home provides the perfect flex space for working from home, a study, or additional guest accommodations. With multiple living spaces, timeless character, thoughtful functionality & an unbeatable location near neighborhood amenities, this home offers the flexibility & charm you've been looking for and is ready for you to make it your own! $299,900 Active

1617 Napa Valley Road Edmond, Oklahoma

3 Beds 2 Baths 2,025 SqFt 0.172 Acres

MASSIVE PRICE REDUCTION! Beautifully maintained home in Edmond offering a blend of comfort, style, and thoughtful upgrades throughout. The main living area features wood-look tile flooring, custom trim work, and a coffered ceiling that adds architectural detail. The open kitchen includes custom cabinetry, a large pantry, granite counters, and a functional layout ideal for everyday living and entertaining. The living room centers around an indoor log gas-burning fireplace, creating a warm and inviting focal point. The primary suite provides a spacious retreat with cove lighting, a large walk-in closet, a jetted tub, and a walk-in shower. Additional bedrooms offer generous storage and natural light. Outside, enjoy a covered back porch perfect for year-round gatherings. The home also includes an inground garage storm shelter, full gutters, and well-designed storage throughout. Located in a desirable Edmond community with convenient access to shopping, dining, and major highways, this property offers quality craftsmanship and comfortable living.Buyer to verify all information. Ask how you can receive 1% of your loan amount back in lender credits!Other flexible options to make this home yours: • Standard lease (12-month term with optional renewal) • Rent-to-own available with 20% down and approved application Buyer to verify all information. $255,000 Active

525 NW 171st Terrace Edmond, Oklahoma

3 Beds 2 Baths 1,607 SqFt 0.139 Acres

A welcoming covered front porch, inviting interior spaces, and a private backyard create an appealing blend of comfort, style, and everyday functionality in this Edmond home. The open kitchen connects naturally with the surrounding living areas, creating an easy flow for daily routines and entertaining. A gas fireplace adds warmth and ambiance, while the wet bar offers a convenient feature for serving refreshments and hosting guests. The sunroom provides a bright, versatile retreat for morning coffee, reading, or simply enjoying a peaceful moment.The spacious primary bedroom offers a distinctive bump out reading nook, creating a comfortable place to relax with a favorite book or unwind at the end of the day. The primary bathroom features a soothing soaking tub, and the walk in closet provides valuable storage and organization. A guest bathroom with a double sink vanity and tiled finishes adds another thoughtful touch, combining practical function with a polished appearance.Outside, the large wooden back patio creates an inviting setting for outdoor dining, gatherings, or quiet evenings in the fresh air. The nicely sized backyard offers room to enjoy the outdoors, while mature trees add privacy and a natural backdrop that enhances the sense of retreat. The combination of patio space and established trees creates a setting that feels both useful and relaxing.From the warmth of the fireplace to the comfort of the primary suite and the appeal of the tree lined backyard, this home offers something to appreciate in every area. Open living spaces, distinctive details, and inviting indoor and outdoor retreats come together to create a home well suited to entertaining, unwinding, and enjoying the best of everyday living. $339,900 Active

524 Canyon Road Edmond, Oklahoma

4 Beds 3 Baths 2,979 SqFt 0.347 Acres

This beautiful four-bedroom, two-bath home with a three-car garage located in the desirable Delmer Lakes community. The thoughtfully designed floor plan features tile flooring throughout the main living areas with comfortable carpeting in the bedrooms. The kitchen has cabinets to the ceiling, built in stainless steel appliances, decorative backsplash, and 3cm granite counter tops. The primary suite boasts a gorgeous ceiling detail, an attached bathroom with a dual sink vanity, walk in shower, whirlpool tub & large walk in closet while the walk-through laundry room provides convenient access directly to the primary closet—a practical feature that makes everyday living easier.The covered back patio offers a wood burning fire place, TV and cable hookups, and a gas line for your grill. This home also provides a whole home air filtration system that will make breathing easy, Rinnai Tankless water heater to provide endless hot water, R-44 insulation and a TechShield radiant barrier to provide more energy efficiency! In the garage you will find a charging station for your electric vehicle.A storm shelter located in the garage offers added peace of mind during Oklahoma weather. Beyond the home, Delmer Lakes offers wonderful neighborhood amenities including a catch-and-release fishing pond, basketball court, greenbelts, walking trails, and an attractive landscaped entrance with a water feature.With four bedrooms, a three-car garage, functional design, and access to inviting community amenities, this home offers a wonderful combination of space, comfort, and lifestyle. Schedule your private showing and discover all this home has to offer! $370,000 Active

3032 Dudley Drive Edmond, Oklahoma

4 Beds 2 Baths 1,855 SqFt 0.226 Acres

Welcome to this charming 3-bedroom, 2-bathroom home in the desirable Silverhawk neighborhood of Edmond! This well-maintained home offers 1,429 square feet of comfortable living space with an inviting layout designed for everyday living and entertaining. The spacious living area provides a great place to gather, while the kitchen offers plenty of room for preparing meals and staying connected with family and guests. The primary suite provides a comfortable retreat, with two additional bedrooms offering flexibility for family, guests, a home office, or hobbies. Outside, enjoy a nicely sized backyard with plenty of potential for relaxing, entertaining, or creating your own outdoor space. A 2-car attached garage provides convenient parking and storage. Located in Edmond with easy access to shopping, dining, schools, and major roadways, this home is ready for its next chapter! $239,900 Active

2220 NW 172nd Street Edmond, Oklahoma

3 Beds 2 Baths 1,429 SqFt 0.169 Acres

Welcome to this beautiful two-story home in desirable Chisholm Creek Farms! Thoughtfully designed for both everyday living and entertaining, this home features the primary suite conveniently located on the main level and complete with double vanities.  The open-concept floorplan seamlessly connects the family room, dining area, and kitchen, creating an inviting space for gatherings. Upstairs offers three additional bedrooms, a full bathroom, and a versatile bonus room perfect for a playroom, media room, home office, or flex space. Nestled on a quiet cul-de-sac, this wonderful home offers comfort, functionality, and plenty of space. $435,000 Active

605 NW 179th Circle Edmond, Oklahoma

4 Beds 3 Baths 2,610 SqFt 0.188 Acres

Looking in the highly sought out Chimney Hill neighborhood? This home has big potential! The living room offers a cathedral ceiling with rustic beams, fireplace, ceiling fan, and wood floors that carry throughout the main areas of the house and office.  You'll also find a formal dining and a home office/study with a closet. The spacious kitchen offers a cathedral ceiling with a rustic beam, breakfast bar, room for a large table and includes updated granite counter-tops, back-splash, stove, double ovens, and dishwasher.  Off of the kitchen is a laundry room, pantry cabinets, and an upstairs bonus room that has it's own HVAC!  Other updates in the past include: roof and gutters, HVAC downstairs, bathrooms, interior paint and wood look laminate floors in bedrooms.  Neighborhood amenities include: greenbelt, pool, sports courts, and playground. $300,000 Active

2301 Woodford Way Edmond, Oklahoma

3 Beds 2 Baths 2,210 SqFt 0.198 Acres

Discover a one of a kind home located in the highly sought after Deer Creek public school district! this beautiful property is full of character and charm, featuring gorgeous tile work throughout the home.The flexible layout offers 2 bedrooms, 2 bathrooms, plus 2 additional rooms, one upstairs one downstairs that can be used as bedrooms, a home office, studio, playroom, or whatever best fits you lifestyle. Enjoy the peaceful setting from the backyard with beautiful views of the surrounding nature. The property also features a new sprinkler system. If you are looking for a home with personality, unique architectural details, flexible living space, a new sprinkler system and a peaceful setting in Deer Creek School, this one you'll want to see! $353,000 Active

7237 NW 153rd Edmond, Oklahoma

2 Beds 2 Baths 1,989 SqFt 0.26 Acres

Welcome to this beautifully updated 3-bedroom, 2-bathroom Edmond home featuring extensive modern upgrades throughout! The bright interior boasts fresh paint (2026) and brand-new flooring (2026) stretching across a spacious floor plan, which includes a separate study perfect for a dedicated home office or quiet retreat. The fully reimagined kitchen is equipped with stunning new countertops (2026) and brand-new appliances (2026), including a new microwave, stove, and dishwasher. Offering incredible flexibility, the kitchen utilities are set up to accommodate either a gas or electric stove to match your cooking preference. Major structural and mechanical updates bring total peace of mind, featuring a fully replaced AC system and a new roof installed in 2025. Conveniently located in the highly sought-after Edmond School District with quick access to local shopping and dining. Schedule your private showing today! $319,995 Active

2812 NW 167th Street Edmond, Oklahoma

3 Beds 2 Baths 2,207 SqFt 0.166 Acres

A Rare Edmond Sanctuary on 1.2 Wooded AcresTucked away on a quiet cul-de-sac, this meticulously cared-for 5-bedroom, 2.1 bath home offers the rare combination of privacy and convenience. Situated on 1.2 wooded acres with a winding creek and trails in the backyard, this property feels like country living while remaining within city limits and the sought-after Deer Creek School District.Inside, the thoughtfully designed floor plan flows seamlessly from the kitchen to the living and dining areas, creating an inviting space perfect for entertaining. Large windows bring the beauty of the surrounding woods indoors. The spacious primary suite is located downstairs with the four additional large bedrooms upstairs. Plus the abundant storage throughout the home, there’s room for everyone and everything!A detached 19’x10’ workshop provides dedicated space for projects, while the renovated 2-car garage offers even more possible living space (an additional 487sqft). A 30'x10' concrete pad lends additional possibilities! Thoughtfully updated, this home is move-in-ready! ***Recent improvements include: a new roof (2025), new downstairs HVAC, new hot water heater, updated bathrooms, backyard fencing, and fresh paint.*** A home like this is rare. Don’t miss your chance to enjoy Edmond living at its best! $439,900 Active

4008 Creekwood Edmond, Oklahoma

5 Beds 3 Baths 2,869 SqFt 1.2 Acres

Welcome to your dream home! For a LIMITED TIME, take advantage of Builder's $5000 incentive toward options or closing costs! This stunning new construction home, built by an award-winning, Professionally Certified Builder, offers the perfect blend of luxury, comfort, and functionality. The thoughtfully designed Ellwood floor plan showcases stylish upgraded wood-look tile flooring throughout all main living areas, creating a warm and inviting atmosphere. Step into the chef-inspired kitchen, complete with custom-built maple cabinetry, upgraded stainless steel appliances, abundant countertop space, and a spacious walk-in pantry, ideal for both daily living and entertaining. Tucked away for added privacy, the serene primary suite serves as a relaxing retreat with its generously sized bedroom, expansive walk-in closet, and spa-like en-suite featuring a garden tub and an elegant, fully tiled glass shower. Two additional bedrooms offer ample closet space and share a beautifully appointed hall bath with a fully tiled tub surround. A large utility room, window blinds, and an energy-efficient tankless water heater provide modern convenience throughout. This home also comes complete with an underground sprinkler system! Enjoy outdoor living year-round with a covered front porch and covered back patio, plus the added benefit of a spacious 2-car garage. This home comes complete with a tankless water heater, blinds, and a sprinkler system! Schedule your tour today and experience the perfect balance of style, space, and smart design! $348,900 Active

4116 Overlook Pass Edmond, Oklahoma

3 Beds 2 Baths 1,765 SqFt 0.14 Acres

Prepare to be captivated by this completely remodeled, turn-key masterpiece. Sitting proudly on a premier corner lot, this home showcases exceptional curb appeal with its crisp modern exterior accents and a vibrant red front door that warmly welcomes you inside. Stepping through the entry, you are greeted by gorgeous new wood-look tile flooring that flows seamlessly throughout the main living areas, perfectly complementing the fresh, neutral color palette. The expansive living room serves as an incredible centerpiece for the home, boasting soaring vaulted ceilings with a central accent beam, dual oversized windows, and a stunning brick fireplace flanked by custom white built-in bookshelves. The floor plan features two distinct dining spaces. Between the living room and kitchen sits an elegant formal dining room highlighted by classic wainscoting trim and double doors opening to the patio, while a secondary sunny breakfast nook offers a bright spot for casual meals. The beautifully modernized kitchen is a chef's delight, showcasing sophisticated deep slate-blue cabinetry, sleek granite countertops, and a crisp white subway tile backsplash. The updates carry into the private primary suite, which offers a retreat complete with plush new carpeting, generous closet space, and a spa-like en-suite bathroom featuring a double granite vanity with matching designer cabinetry. With four bedrooms in total, this highly functional layout offers unmatched versatility. One of the bedrooms is perfectly positioned to transition into a private den, executive home office, or hobby room, uniquely benefiting from its own direct entrance to the backyard. Outside, the sprawling corner lot provides a massive, fully fenced backyard shaded by mature trees, offering a private canvas for outdoor recreation, gardening, or weekend barbecues. Combining the character of an established Edmond neighborhood with the pristine finishes of a comprehensive top-to-bottom remodel. $299,900 Active

2712 Clover Glen Drive Edmond, Oklahoma

4 Beds 2 Baths 2,296 SqFt 0.159 Acres

Welcome to this beautifully maintained 2-bedroom, 2-bathroom townhome in The Crossings, a desirable Edmond community offering an unbeatable combination of comfort, convenience, and amenities. Ideally located near shopping, dining, and two major highways, this home provides easy access to everything Edmond and the surrounding area have to offer. Inside, you’ll find a functional and inviting floor plan featuring a spacious living area with fireplace, dining space, kitchen, laundry area, and generously sized closets. The thoughtful layout offers one bedroom and a full bathroom conveniently located on the main level, while the second bedroom and full bathroom are located upstairs, providing flexibility and privacy for guests, family, or a home office. Recent improvements include new flooring throughout, new storm doors, and a roof and gutters that are approximately two years old. The home also includes the washer and dryer, making it truly move-in ready. Step outside to enjoy the covered back patio overlooking the fully fenced backyard—a private space perfect for relaxing, entertaining, or enjoying your morning coffee. A concrete pathway provides easy access from the home to the oversized detached garage, offering excellent storage and parking space. Residents of The Crossings enjoy an array of community amenities, including an outdoor swimming pool, playground, clubhouse, basketball court, and tennis court. With its convenient location, desirable floor plan, recent updates, private outdoor space, and fantastic community amenities, this Edmond townhome is one you won’t want to miss! $197,500 Active

13819 W Crossing Way Edmond, Oklahoma

2 Beds 2 Baths 1,201 SqFt 0.049 Acres

Oakridge Floor Plan - This single-level home showcases a spacious open floorplan shared between the kitchen, dining area and family room for easy entertaining during gatherings. An owner’s suite enjoys a private location in a rear corner of the home, complemented by an en-suite bathroom and walk-in closet. There are two secondary bedrooms along the side of the home, which are ideal for household members and hosting overnight guests. Prices, dimensions and features may vary and are subject to change. Photos are for illustrative purposes only. Everything's Included: Washer/Dryer, Refrigerator, Garage Door Opener, Closing Cost assistance available. Home is currently under construction with anticipated completion in January. $232,400 Active

20532 Velvet Street Edmond, Oklahoma

3 Beds 2 Baths 1,266 SqFt 0.11 Acres